Project Gallery

Bass Pro Shop

Rossford, Ohio - Synergy Steel Services

Tonnage - 325 tons

This project was not heavy but encompassed many roof systems (Hip and Valley) with some comprised of Trusses – transitions were dealt with easily with the 3-D modeling using SDS2.

Salvation Army

Quincy, IL - LeJeune Steel

Tonnage - 500 Tons

This project had several challenging aspects to it with multiple trusses, skewed beams and curved areas as well as moment connections. We worked closely with the Fabricators Engineer to ensure all connections were adequate and erectable.

Quincy 10 Story Addition

Quincy, Illinois - Synergy Steel

Tonnage - 900 tons

This project started off as a simple repetitive job but quickly changed after a survey of the existing concrete columns revealed the bay spacing and column locations were not where the customer had anticipated.  This created many different pieces with specialized connections.
After working closely with the Surveyor, Architect and Engineer we got the project flowing smoothly again and successfully completed on schedule.

Altra Ethanol Distillation Plant

Altra, Indiana - Synergy Steel

Tonnage - 325 tons

Elevated platforms with handrail and stairs.

We detailed this project keeping an aggressive schedule with multiple revisions.

Lakeshore Gold Corp. Headframe

Timmins, Ontario - Noront Steel

Tonnage - 272 Tons


This project was for a Gold Mining Company.  The Headframe is used for hoisting (hauling) ore to the surface and transporting miners underground.  There was alot of intricate detailing due to the close proximity of all the members to fit into a very small footprint.  Clash checks with SDS2 were invaluable on this project as we found interferences overlooked by the Structural drawing layouts.


 

Let's Talk About Your Project

We've completed hundreds of detailing projects of all sizes throughout North America. We'd like to show you why we're one of the industry's 'top performing' detailing firms.

Schedule a Call >

Why Hire Us?

  • 25+ years of steel detailing experience
  • Our solid reputation
  • Our SDSII modeling technology
  • We face project challenges head-on
  • Our quality team

Testimonials

MCS Detailing has done an exceptional job in communicating the required information to keep the detailing process moving forward. The RFIs received from MCS are clear and concise. MCS Detailing is a team player by helping to find solutions when presented with a challenge rather than making excuses.

The MCS Detailing team, under the direction of Tim McAuliffe has always risen to the challenge to provide Noront with quality detailed shop drawings in a very timely fashion. A true 5-Star detailing company, MCS Detailing comes with Noront’s highest recommendation.

MCS's quality, attentiveness to detail, personal touch, honesty and professional way of conducting business is unparalleled in the fabrication business. Tim McAuliffe hasn't "dropped the ball" once in our relationship. He responds over and above the call of duty. Synergy Steel Structures credits MCS with numerous money making, successful projects.

Working with MCS enabled us to experience their top performance within budget and on time within a very tight schedule. This project presented some unique design challenges which were all seamlessly overcome. MCS had a smooth integration with Walters right through shop drawing and connection design approval to field erection diagrams.

Throughout the [Apple retail store] project, MCS paid close attention to the details and did a great job of coordinating with the shop drawings and myself. Their use of SDSII for the modeling was a huge benefit since it is compatible with our in-house systems.

View All Testimonials >